Dear Beloved Community,

It’s been a full year since our dining hall and kitchen renovation
was completed in June last year! 

In June 2025, we hosted our first themed retreat since the kitchen
and dining hall renovation completion for our Buddhist Youth Group
Retreat (Gia Đình Phật Tử) with 525 participants!

Our hearts are filled with gratitude for the love  you’ve poured into
helping us realize our dream, with our kitchen and dining
hall
renovations which now meet the needs of more friends
participating in
large scale retreats and of being protected from both the extreme heat
and cold. We no longer have to shiver with chattering teeth, standing
in line during the Holiday Retreat to serve our meals, nor do we need
to bat away mosquitoes in the sweltering heat as we used to with
overflows when there was no more space in the dining hall and had to sit
either in the open veranda or at the picnic tables lined under the row
of majestic oak trees.

We are also grateful for our brothers who hosted our meals in the
brothers’ dining hall and lent their kitchen for the whole of 2025 whilst
the renovations were taking place, both for the personal retreats and
the themed retreats!

To honor this beautiful metamorphose, we would like to show you some
images of our process from where we first started and where we are now. 

Before we hosted the Buddhist Youth Group, we had a Hungry Ghost Offering
and a ceremony to bless our newly renovated kitchen and dining hall.
Following that, we celebrated with a special dinner and it was a true joy to
finally reopen our kitchen and dining hall!

Our dining hall is divided into 3 sections: Dining Hall 1, Dining Hall 2, with a
wash up area, public restrooms, a meeting room, and a tea room. Our old
office which used to be located in the dining hall has been moved to where the
old bookshop used to be–and the books store has moved just next door to the office,
across from the basketball court. Our dining halls, meeting room, and
washing-up area also serve as additional locations for dharma sharing groups;

a true blessing to be protected by the elements, from both the rain and the extreme humid heat of the South.

On another note, while we are ever grateful for your unwavering love and

support in helping us complete our renovations, if you are able to, we are 

actually still in need your help. 

Out of the $400,000 of our original ask, we would like to humbly ask if 

you could help us fully realize our goal of completion as we’re still short

of $110,487.

If you have been inspired by our retreats and would like to help us, please
 see the many ways of contributing below. Every cent counts!

Again, we sincerely thank you all from the bottom of our hearts and hope to welcome you at a retreat in the near future! 

May we continue to grow as a community with both dharma
nourishment and edible nourishment thanks to this work of love.
Come enjoy eating meditation with us soon in our beloved dining hall!

A deep bow, 

Magnolia Grove Monastery 

Before
After
Hungry Ghost Offering upon completion of our Kitchen and Dining hall Renovation
Hungry Ghost Offering upon completion of Kitchen and Dining hall Renovation
Hungry Ghost Offering
Hungry Ghost Offering
Blessing the Kitchen and Dining Hall
Blessing the Dining Hall
Blessing the washing up area
Br. Phap Nha
Blessing Dining Hall 2
Sr. Hy Nghiem
Blessing the Kitchen
Sr. Hoc Nghiem
Blessing Dining Hall 1
Sr. Hy Nghiem
Old Kitchen
Old Kitchen and back veranda
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen
Kitchen Framework
Kitchen
Kitchen
Item #12
Before
Now
Sideview Dining hall in snow
Dining Hall Sideview Sunset
Completed Inside Kitchen (cooking for 525 retreatants!)
Buddhist Youth Group: 525 Participants
6 Serving Lines for 525 Retreatants
Pots washing area
Dharma Sharing serving area
Before (tearoom)
Completed (tearoom)
New Cooler Installation
Completed Cooler
Dining Hall 2: Children and Parents Beginning Anew
525 Buddhist Youth Retreat
A breakdown of the renovation project

Here is a detailed breakdown of the estimated costs of our renovation project:

1. Slab concrete material and labor: $50,000.
2. Expansion and new building (Steel beams) : $400,000.
3. Labor walls, drywall: $45,000.
4. Drywall sheeting: $15,000.
5. DelPro ceiling panels, trims: $50,000
6. Kitchen Vent and hood mounting: $10,000.
7. A/C. Materials & labor: $50,000.
8. Concrete blocks, rebar, wires, plastics: $5000
9. Electrical wires: $15,000
10. Plumbing: $10,000
11. Kitchen drop down ceiling: $10,000
12. Windows & doors: $65,000
13. Kitchen tiles: $30,000
14. Floor stain: $25,000
15. Renew tiles for bathroom: $15,000
16. Misc: $15,000.
17. Demolition: $20,000.

Estimated at around: $830,000with unexpected unforeseeable construction costs we are expecting the project to be $1 Million.

Zelle Contributions:

For ZELLE Contributions: 662-654-6750 – Emmie Luan

Memo: For Dining Hall Construction

Please also include your name and address so we can issue you a thank you letter

For Checks:

Make Payable to: Magnolia Grove Monastery

Memo: For Dining Hall Construction

Address: 123 Towles Road, Batesville, MS 38606

Domestic Wire:

Receiving Bank: Regions Bank

Bank Address:

290 Highway 6 West,

Batesville, MS 38606

Routing #: 065305436

Account #: 0184818123

Beneficiary Name: Magnolia Grove Monastery

International Wire:

Receiving Bank: Regions Bank

Bank Address:

290 Highway 6 West,

Batesville, MS 38606

Swift Code: UPNBUS44

Account #: 0184818123

Beneficiary Name: Magnolia Grove Monastery

SUBSCRIBE TO OUR WEBSITE

Sign up here to receive email notifications when new posts are published on this website. You can unsubscribe at any time with one click.

Scroll to Top